How do the time and cost required to commission a busway system compare to traditional power distribution methods?
Busway installation is significantly faster than traditional cabling methods.
A single busway run can replace multiple cable runs, reducing installation complexity.
With a busway, you only need to test a few connection points, whereas with cables, each circuit must be individually tested.
Tap-offs are pre-tested at the factory, meaning less on-site testing is required.
Overall, commissioning a busway system is much faster, simpler, and requires fewer labor hours than traditional PDUs and whips.
Canada
Latin America (English)
Latin America (Espanol)
USA
China
India
Japan
Republic of Korea
South East Asia (English)
Austria
Belgium
France
Germany
Italy
Netherlands
Spain
Switzerland
Turkey
UK
Africa (english)
Africa (français)
Middle East (english)
Australia
New Zealand